The shipping platform

manage your shipping data, trade and automate work-flows
Nghi Son (Vietnam)
VNNGH UN LOCODE
19.3117° / 105.8149° Latitude / Longitude
GMT +7Time Zone

Port Restrictions

Max draft: 20.5

Max LOA: 333

Max DWT: 320,000

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Nghi Son lies 27.1 n.m. south of Thanh Hoa, 101 n.m. south of Hai Phong and 42 n.m. north of Nghe Tinh. General overview: Nghi Son port consists of the bulk harbour to the south, Nghi Son Petrochemical Refinery Complex to the north and Nghi Son SPM offshore. Port is undergoing expansion within the Nghi Son Petrochemical Refinery Complex. Load line zone: China Sea Seasonal Tropical Area, Tropical Jan 21 to Apr 30, Summer May 1 to Jan 20. Max. size: Breakbulk: 20,000 d.w.t., depth 12.0 m. Containers: 20,000 d.w.t., depth 12.0 m. Ro-Ro: 20,000 d.w.t., depth 12.0 m. Bulk: 37,000 d.w.t., draft 13.0 m. (tidal). Crude: 320,000 d.w.t., LOA 333 m., draft 20.5 m. Products: 40,000 d.w.t., LOA 176 m., draft 11.1 m. Gas: 12,825 d.w.t., LOA 128 m., draft 8.8 m. The largest vessel called at the port: LOA: 336 m; draught: 10.7 m, deadweight: 70,500 t.

SERVICE PROVIDERS

Port Agency

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • LPG
  • Ro-Ro
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Mon 22
forecast-image
25 - 30°C
18 km/h
Earrow
100%
Tue 23
forecast-image
25 - 31°C
20.5 km/h
Earrow
45%
Today
forecast-image
24 - 32°C
23.8 km/h
Earrow
92%
Thu 25
forecast-image
24 - 32°C
16.2 km/h
ENEarrow
0%
Fri 26
forecast-image
25 - 40°C
14.8 km/h
Earrow
0%
Sat 27
forecast-image
26 - 40°C
15.8 km/h
ESEarrow
0%
Sun 28
forecast-image
26 - 38°C
19.4 km/h
SEarrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
TAN BINH 239
Position9580493 / BULK

32,000 MT

2010

Batangas
4/17/2024 01:52
Vienna
4/21/2024 04:00
ANNA
Position9892561 / BULK

27,567 MT

2021

Nghi Son
4/23/2024 15:03
Grovehurst Jetty
4/23/2024 16:30
ARC 1
Position9661431 / TANK

7,048 MT

2013

Ulsan
4/12/2024 11:31
Nansha
4/26/2024 19:00
PETROLIMEX 15
Position9191759 / TANK

17,960 MT

1999

B12 Oil Terminal
4/21/2024 14:37
St George's
4/22/2024 18:00
TM HAI HA PETRO
Position9352262 / TANK

4,814 MT

2005

Danang
4/18/2024 08:25
North Sea
4/19/2024 18:00
SAI GON SKY
Position9420095 / TANK

7,119 MT

2009

Dinh Vu
4/20/2024 23:00
Nghi Son
4/21/2024 20:00
LONG PHU 20
Position9326225 / TANK

8,803 MT

2005

Danang
4/17/2024 14:40
Danang
4/18/2024 18:00
FUXIANG
Position9253844 / BULK

47,299 MT

2002

Kuantan
4/18/2024 06:26
Nghi Son
4/22/2024 16:00
WESTERN FUJI
Position9856268 / BULK

63,500 MT

2020

Chiwan
4/19/2024 07:15
Thanh Hoa
4/22/2024 11:00
ANDALUCIA
Position9370745 / BULK

49,527 MT

2008

Sungai Pakning
4/16/2024 14:07
Nghi Son
4/22/2024 07:00
NHA BE 08
Position9291200 / TANK

6,678 MT

2003

B12 Oil Terminal
4/7/2024 00:27
Nghi Son
4/21/2024 14:00
CALYPSO
Position9892559 / BULK

27,573 MT

2021

Nghi Son
4/23/2024 15:04
Tsu
4/24/2024 13:00
HEIDE OLDENDORFF
Position9871103 / BULK

208,000 MT

2021

Semayang
4/5/2024 02:02
Nghi Son
4/16/2024 20:00
ROYAL CRYSTAL 7
Position9381330 / TANK

13,080 MT

2007

Erman
4/22/2024 04:15
Nghi Son
4/24/2024 14:00
YOZAN
Position9562491 / BULK

63,937 MT

2014

Shulanghu
4/18/2024 10:07
Nghi Son
4/23/2024 13:30
BAO DAT THANH 89
Position9357913 / BULK

49,602 MT

2007

Lamma Island
4/20/2024 08:47
NGHISON_VN
4/22/2024 15:00
YN BUSAN
Position9805300 / TANK

6,596 MT

2018

Phuoc Thai
4/21/2024 13:00
Nghi Son
4/23/2024 19:30
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
Clinker
25,000 MT/---
4/25/24 - 4/30/24
Clinker
25,000 MT/---
4/25/24 - 4/30/24
Clinker
27,000 MT/---
4/25/24 - 4/30/24
Clinker
25,000 MT/---
4/25/24 - 4/30/24
Clinker
27,000 MT/---
4/25/24 - 4/30/24
Clinker
25,000 MT/---
4/25/24 - 4/30/24
Cement
7,000 MT/---
4/25/24 - 4/29/24
Clinker
30,000 MT/---
4/28/24 - 5/3/24
Clinker
30,000 MT/---
4/28/24 - 5/3/24
Clinker
30,000 MT/---
4/28/24 - 5/3/24
Clinker
30,000 MT/---
4/28/24 - 5/3/24
Clinker
30,000 MT/---
4/28/24 - 5/3/24
Clinker
30,000 MT/---
4/28/24 - 5/3/24
Oil Pipes
4,847 MT/7,341.6 CBM
5/1/24 - 6/15/24
Bulk Cargo
8,000 MT/---
5/1/24 - 5/31/24
Clinker
50,000 MT/---
5/1/24 - 5/31/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/1/24 - 5/31/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/1/24 - 5/31/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/1/24 - 5/31/24
Bulk Cargo
20,000 MT/---
5/1/24 - 5/10/24
Bulk Cargo
25,000 MT/---
5/1/24 - 5/10/24
Wood Chips
---/90,000 CBM
5/1/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Iron Ore Concentrates
5,000 MT/---
5/5/24 - 5/10/24
Clinker
50,000 MT/---
5/11/24 - 5/20/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/11/24 - 5/20/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/11/24 - 5/20/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/11/24 - 5/20/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/16/24 - 5/31/24
Ground Blast-furnace Slag (granulated)
25,000 MT/---
5/16/24 - 5/31/24
Limestone Lumps
5,000 MT/---
5/16/24 - 5/31/24
Oil Pipes
4,847 MT/7,341.6 CBM
5/21/24 - 6/20/24
Oil Pipes
4,847 MT/---
5/21/24 - 6/20/24
Oil Pipes
4,847 MT/---
5/21/24 - 6/20/24
Oil Pipes
4,847 MT/---
5/21/24 - 6/20/24
Cement
27,000 MT/---
6/1/24 - 2/28/25
Oil Pipes
4,847 MT/7,341.6 CBM
6/1/24 - 6/15/24
Oil Pipes
4,847 MT/7,341.6 CBM
6/1/24 - 6/15/24
Connecting to SHIPNEXT Network...