The shipping platform

manage your shipping data, trade and automate work-flows
Krishnapatnam (India)
INKRI UN LOCODE
14.2500° / 80.1166° Latitude / Longitude

Port Restrictions

Max draft: 17.7

Max beam: 48

Max LOA: 300

Max DWT: 190,000

Mean Tide: 1

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Krishnapatnam is located on the E coast of India in the Bay of Bengal, approx. 70NM N of Chennai. General overview: The Port of Krishnapatnam is a deep water port, operated by Adani, continuously grows and will soon be regarded as on of the biggest ports worldwide. The port handles operation all year round and can handle big vessels like Capesizes. Berths: - N1 - N8 - WB1 - WB3 - S4 - S4A Krishnapatnam handles cargoes such as containers, general cargo, coal, cement, tankers and project cargoes. Handling Equipment: - 9 Gantry Cranes (100t) - 12 Shore Cranes (100t - 150t) Load line zone: Bay of Bengal Seasonal Tropical Area Tropical Dec 1 to Apr 30 Summer May 1 to Nov 30. Max size: LOA 300m // Beam 48m // Draught 17.7m // 190,000DWT.

SERVICE PROVIDERS

Marine equipment & spare parts

Port Agency

Ship Chandler

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • Multipurpose

AVAILABLE WAREHOUSES

  • Dry bulk (ore, coal, etc)
  • Liquid
  • General cargo
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 30
forecast-image
26 - 42°C
31.7 km/h
SEarrow
%
Wed 1
forecast-image
28 - 43°C
32.4 km/h
SEarrow
%
Today
forecast-image
30 - 44°C
34.2 km/h
SEarrow
0%
Fri 3
forecast-image
30 - 44°C
40 km/h
SEarrow
0%
Sat 4
forecast-image
31 - 43°C
36.7 km/h
SEarrow
0%
Sun 5
forecast-image
30 - 43°C
33.5 km/h
SEarrow
0%
Mon 6
forecast-image
31 - 44°C
38.2 km/h
SEarrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
ZELLA OLDENDORFF
Position9863106 / BULK

180,857 MT

2020

Locust Point
3/21/2024 21:00
Krishnapatnam
4/30/2024 17:00
AE VENUS
Position9434711 / BULK

56,847 MT

2009

Krishnapatnam
5/1/2024 04:50
VENIA
Position9221229 / BULK

171,448 MT

2001

Salalah
4/16/2024 13:33
Krishnapatnam
4/28/2024 11:00
STAR NASIA
Position9361237 / BULK

82,220 MT

2006

Paradip
4/29/2024 04:57
Krishnapatnam
5/1/2024 11:00
HAFNIA AZOTIC
Position9719757 / TANK

38,506 MT

2015

Cape Town
4/13/2024 16:45
Krishnapatnam
4/30/2024 17:30
VISHVA BANDHAN
Position9464778 / BULK

57,196 MT

2011

Paradip
4/28/2024 19:10
KRSNPTNM
5/1/2024 12:00
WEALTHY BAY
Position9197040 / TANK

12,756 MT

1998

Bintulu Terminal
4/20/2024 13:29
Krishnapatnam
5/1/2024 06:00
PENNA SURAKSHA
Position9310599 / BULK

26,716 MT

2006

Krishnapatnam
1/16/2024 11:43
Krishnapatnam
4/29/2024 12:30
CROWNED EAGLE
Position9418729 / BULK

55,940 MT

2008

Pulau Baai
4/24/2024 08:51
Krishnapatnam
4/30/2024 12:30
NAOMI
Position9750971 / BULK

180,000 MT

2016

tanjung pengelih
4/25/2024 04:12
Krishnapatnam
5/1/2024 07:30
PIONEER HARMONY
Position9652375 / BULK

26,102 MT

2013

Mumbai
4/26/2024 06:25
Krishnapatnam
5/1/2024 16:00
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
Iron Ore Fines
60,500 MT/---
India
5/18/24 - 5/23/24
Iron Ore Fines
60,500 MT/---
India
5/18/24 - 5/23/24
Iron Ore Fines
60,500 MT/---
India
5/18/24 - 5/23/24
Iron Ore Fines
60,500 MT/---
India
5/18/24 - 5/23/24
Iron Ore Fines
60,500 MT/---
India
5/18/24 - 5/23/24
Iron Ore Fines
60,500 MT/---
India
5/18/24 - 5/23/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Pig Iron
10,000 MT/---
6/1/24 - 6/30/24
Bulk Cargo
5,000 MT/---
7/5/24 - 7/12/24
General Cargo
---/145 CBM
9/1/24 - 10/15/24
Connecting to SHIPNEXT Network...