The shipping platform

manage your shipping data, trade and automate work-flows
Mtwara (Tanzania)
TZMYW UN LOCODE
-10.2666° / 40.1833° Latitude / Longitude

Port Restrictions

Max draft: 9.6

Max LOA: 212

Max DWT: 60,000

Mean Tide: 3

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: The Port of Mtwara is strategically situated at the mouth of the Mturara River in southern Tanzania, near the border with Mozambique. General overview: As one of Tanzania Ports Authority's prominent ports, the Port of Mtwara boasts a well-equipped quay wall stretching 685 meters. This infrastructure allows for the simultaneous berthing of up to four ships and one coastal vessel. The port primarily specializes in handling general cargo, catering to the needs of its immediate hinterland. Notably, it plays a vital role in the importation of foodstuffs and general goods, while also serving as a significant hub for exporting cashew nuts, cassava roots, simsin, and sisal. Cashew nuts, in particular, constitute a substantial portion of the port's export volume. . Its facilities are specifically designed to efficiently handle both conventional and containerized cargo, supporting smooth trade operations. Handling Equipment: - SSG - Forklifts - Mobile Cranes - Reach Stackers - Mobile Harbour Crane Storage: - Oil Tanks - Open Yards - Warehouses Traffic figures: The Port of Mtwara handles an impressive annual volume of approximately 1,000,000 metric tons of imports and exports. Load line zone: Tropical

Site: ports.go.tz

SERVICE PROVIDERS

Port Agency

Port Operator

Survey Company

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • Passenger
  • Bunkering

AVAILABLE WAREHOUSES

  • Dry bulk (ore, coal, etc)
  • Liquid
  • General cargo
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 7
forecast-image
23 - 29°C
19.8 km/h
SSEarrow
100%
Wed 8
forecast-image
23 - 28°C
19.8 km/h
SSEarrow
100%
Today
forecast-image
23 - 30°C
20.5 km/h
SSEarrow
93%
Fri 10
forecast-image
22 - 29°C
20.2 km/h
SSEarrow
84%
Sat 11
forecast-image
22 - 29°C
14 km/h
Sarrow
0%
Sun 12
forecast-image
22 - 29°C
16.6 km/h
SSEarrow
0%
Mon 13
forecast-image
22 - 29°C
18.4 km/h
SSEarrow
88%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
NAGA SEJAHTERA III
Position8902096 / MPP

1,780 MT

1989

Zanzibar City
5/7/2024 22:32
Kea
5/9/2024 14:00
ULTRA COLONSAY
Position9448217 / BULK

61,470 MT

2011

Kipevu Oil Terminal
4/27/2024 09:35
Mtwara
4/29/2024 13:00
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/1/24 - 5/15/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/9/24 - 5/23/24
Coal
55,000 MT/---
5/16/24 - 5/31/24
Coal
55,000 MT/---
5/16/24 - 5/31/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
55,000 MT/---
6/11/24 - 7/4/24
Coal
60,000 MT/---
12/20/24 - 12/25/24
Cashew Nuts
5,000 MT/---
12/30/24 - 1/13/25
Connecting to SHIPNEXT Network...