The shipping platform

manage your shipping data, trade and automate work-flows
Hambantota (Sri Lanka)
LKHBA UN LOCODE
6.1166° / 81.1333° Latitude / Longitude

Port Restrictions

Max draft: 17

Max beam: 50

Max LOA: 293

Max DWT: 106,438

Channel Depth: 17

Anchorage Depth: 20

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

16mt

14 Forklifts (from 3 to 16) MT

41mt

Dockside Crane

41mt

Multipurpose Quay Crane

50mt

Mobile Crane / Tyre crane

50mt

2 Dockside Cranes

80mt

Mobile Crane / Tyre crane

General Description

Location: Hambantota is located on the S coast of Sri Lanka, about 240km S of Colombo. General overview: The Port of Hambantota (officially named Magampura), operated by CMPort, is the most diversified port in Sri Lanka. A MPP port which provides services to bulk, container, Ro/Ro, break bulk, project cargo, oil, gas, bunkering and cruise. Berths: - Small Craft: 120m Length // 8m Width // 5m Depth - General Purpose: 2 berths // 600m Length // 40m Width // 17m Depth - Service: 208m Length // 40m Width // 5m Depth - MPP / Container: 3 berths // 838.5m Length // 40m Width // 17m Depth (100,000DWT) - Feeder: 2 berths // 460m Length // 40m Width // 17m Depth (max. permissible draught 11.5m) (100,000DWT) - Container: 3 berths // 838.5m Length // 40m Width // 17m Depth (100,000DWT) - Oil Terminal (North): 310m Length // 46.7m Width // 17m Depth (100,000DWT) - Oil Terminal (North): 300m Length // 46.7m Width // 17m Depth (100,000DWT) Port Capacity: - Container = 300,000 TEUs - Bulk Cargo = 2.5 Million Tons - Break Bulk = 950,000 Tons - RO-RO = 600,000 Units Handling Equipment: - Quay Crane: 3 units // Capacity 41t - 50t - TADANO Mobile Crane: 2 units // Capacity 50t - 80t - RTG: 3 units // Capacity 41t - Portal Crane: 2 units // Capacity 40t Warehousing: - Bonded Cargo: Total Area 10,000SQM - Bulk Cargo: Total Area 10,000SQM - Electronic Products: Total Area 1,600SQM - MCC & LCL Cargo storage is also developing. IMO: Only local Import and on board in transit is allowed. Need to obtain Sri Lanka Ministry of Defence (MOD) permission prior to vessel's arrival. MOD will take 3 working days for clearance, subject to the documents in order. IMO onboard in transit subject to prior approval from authorities, transhipment not allowed in Sri Lanka ports.

Site: www.hipg.lk

SERVICE PROVIDERS

Port Agency

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • Passenger
  • LPG
  • Bunkering
  • Ro-Ro
  • LNG

AVAILABLE WAREHOUSES

  • LPG
  • Dry bulk (ore, coal, etc)
  • Liquid
  • General cargo
  • Reefer cargo
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 7
forecast-image
28 - 32°C
31 km/h
SWarrow
100%
Wed 8
forecast-image
27 - 32°C
33.8 km/h
SSWarrow
100%
Today
forecast-image
26 - 30°C
21.2 km/h
SWarrow
79%
Fri 10
forecast-image
27 - 30°C
12.6 km/h
WSWarrow
88%
Sat 11
forecast-image
27 - 31°C
18.4 km/h
SSWarrow
88%
Sun 12
forecast-image
26 - 30°C
20.9 km/h
SWarrow
88%
Mon 13
forecast-image
26 - 31°C
20.9 km/h
SWarrow
85%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
MSC POLO II
Position9139086 / CONT

22,967 MT

2002

Colombo
5/7/2024 20:30
Hambantota
5/8/2024 12:30
SEA HELLINIS
Position9328728 / CAR

14,962 MT

2005

Fujairah
4/25/2024 18:38
Hambantota
5/8/2024 21:30
ESL DAR ES SALAAM
Position9158525 / CONT

33,751 MT

1999

Colombo
5/7/2024 22:52
Hambantota
5/8/2024 15:30
SMS BROS
Position9157478 / TANK

23,293 MT

1998

Sohar
4/10/2024 02:07
Hambantota
5/5/2024 10:30
OCEAN TIANBO
Position9740134 / BULK

63,579 MT

2018

Batu Ampar
5/3/2024 11:07
Rozi Port
5/14/2024 17:30
NEW ASPIRE
Position9486544 / TANK

296,951 MT

2011

Batu Ampar
5/3/2024 10:20
Mina Al Ahmadi
5/15/2024 21:00
HAN ZHI
Position9125877 / MPP

7,713 MT

1996

Tanjong Pagar
5/2/2024 07:20
Kandla
5/14/2024 11:30
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
General Cargo
875 MT/0 CBM
4/26/24 - 5/10/24
Connecting to SHIPNEXT Network...