The shipping platform

manage your shipping data, trade and automate work-flows
Matarbari (Bangladesh)
21.5510° / 91.9501° Latitude / Longitude

Port Restrictions

Max LOA: 338

Channel Depth: 16

Anchorage Depth: 30

AVAILABLE LIFT AND CRANES

General Description

The port is planned to reduce pressure on the Port of Chittagong.During the first stage, one 300 metres (980 ft) long multipurpose terminal and one 460 metres (1,510 ft) meter long container terminal is planned to be constructed by 2026. The navigation channel will be 350 metres (1,150 ft) length with a maximum permissible draught of 16 metres (52 ft). Ships with the capacity of 8,000 TEU containers will be able to dock.[7] In September 2020, Japan International Cooperation Agency won the contract for the consultancy services of Matarbari Port development project. Two contracts were signed by Roads and Highways Department (RHD) with Oriental Consultants Global Company Ltd and by Chittagong Port Authority with Nippon Koei The container terminal will be built on 18 hectares, and have an annual capacity of 600,000 to 1.1 million TEU. Later, the container terminal will be expanded, up to 70 hectares, with a 1,850 metres (6,070 ft) berth, and have a 2.8 million TEU capacity. JICA said the multi-purpose terminal will be built on 17 hectares, have a 300 metres (980 ft) berth, and be able to accommodate vessels with up to 70,000 dwt. Its annual capacity will be 2.25 million tonnes.
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Fri 10
forecast-image
25 - 31°C
18.4 km/h
WSWarrow
45%
Sat 11
forecast-image
25 - 31°C
22 km/h
Warrow
%
Today
forecast-image
25 - 31°C
20.2 km/h
Warrow
0%
Mon 13
forecast-image
25 - 32°C
21.6 km/h
WNWarrow
0%
Tue 14
forecast-image
26 - 32°C
23.8 km/h
WNWarrow
0%
Wed 15
forecast-image
26 - 32°C
24.1 km/h
WNWarrow
0%
Thu 16
forecast-image
27 - 32°C
22.7 km/h
WSWarrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
INCE MARMARA
Position9832690 / BULK

63,517 MT

2018

Taman
5/4/2024 03:00
SUMMIT LNG
Position9322255 / TANK

77,263 MT

2006

Pulau Sebarok
3/26/2024 10:15
chattagram
4/5/2024 15:30
EJNAN
Position9334076 / TANK

79,000 MT

2007

Ras Laffan
4/25/2024 06:43
MOHESHKHALI
5/8/2024 00:00
EM JADE
Position9405007 / BULK

55,091 MT

2010

Chittagong
4/26/2024 06:47
chattagram
5/12/2024 08:00
VINCENT MOUNTAIN
Position9863807 / BULK

63,500 MT

2020

Chittagong
5/11/2024 05:30
Bakar
5/11/2024 13:00
MEGHNA FREEDOM
Position9622813 / BULK

56,088 MT

2013

Tanjong Pagar
5/7/2024 02:00
chattagram
5/12/2024 09:00
HONG YING
Position9097056 / REEFER

2,562 MT

1984

Lamma Island
4/8/2024 12:35
chattagram
4/23/2024 13:00
SITC YUANMING
Position9932866 / CONT

34,000 MT

2022

Chittagong
5/12/2024 07:25
Yangon
5/14/2024 03:00
ANASSA
Position9590929 / BULK

61,418 MT

2011

tanjung pengelih
5/6/2024 19:11
chattagram
5/12/2024 14:00
NORDIC POLLUX
Position9239848 / TANK

150,103 MT

2003

Ju'aymah
4/28/2024 08:10
chattagram
5/12/2024 01:00
APJ JAI
Position9491393 / BULK

56,594 MT

2011

Muara Berau
4/27/2024 01:00
chattagram
5/8/2024 23:00
TRINITY
Position9545716 / BULK

56,720 MT

2010

Kutubdia
5/11/2024 13:59
Dhamra
5/15/2024 06:00
BANGLAR JYOTI
Position8508943 / TANK

14,541 MT

1987

Kutubdia
4/28/2024 16:16
Tanjung Manis
5/9/2024 15:18
CLIPPER BAROLO
Position9500091 / BULK

58,444 MT

2011

Batu Ampar
5/6/2024 04:08
chattagram
5/11/2024 12:00
VIVA GALAXY
Position9330630 / BULK

53,460 MT

2007

Port Said
4/16/2024 04:30
chattagram
5/2/2024 15:00
DEVBULK GULTEN
Position9690509 / BULK

55,865 MT

2015

Port Said
4/19/2024 05:40
chattagram
5/7/2024 12:00
SARWAR JAHAN
Position9233600 / BULK

50,236 MT

2001

Batu Ampar
5/3/2024 12:30
chattagram
5/10/2024 06:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...