The shipping platform

manage your shipping data, trade and automate work-flows
Covenas (Colombia)
COCVE UN LOCODE
9.5000° / -75.7333° Latitude / Longitude
GMT +3Time Zone

Port Restrictions

Max draft: 7

Max LOA: 250

Mean Tide: 1

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: The offshore oil terminal is situated in the Gulf of Morrosquillo, approx 56nm SSW of Cartagena. General overview: The private offshore terminal owned by Ecopetrol is situated NW of Puerto Covenas, (09° 25'N 075°41'W). The tanker terminal is used for exporting crude oil and consists of 3 SPM's or Tanker loading units (TLU's) and a service pier. Load line zone: Tropical. Max size: SPM: LOA 320m, draught 17.3m, 160,000DWT. Service Pier: LOA 250m, draught 7.0m.

AVAILABLE FACILITIES

  • Break Bulk
  • Liquid
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Sat 2
forecast-image
23 - 30°C
21.2 km/h
SSWarrow
100%
Sun 3
forecast-image
23 - 28°C
20.9 km/h
SWarrow
100%
Today
forecast-image
23 - 26°C
15.5 km/h
SWarrow
87%
Tue 5
forecast-image
22 - 30°C
12.2 km/h
SSEarrow
84%
Wed 6
forecast-image
24 - 30°C
11.2 km/h
NNWarrow
88%
Thu 7
forecast-image
24 - 28°C
12.6 km/h
WNWarrow
89%
Fri 8
forecast-image
23 - 29°C
10.4 km/h
WNWarrow
89%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
YUAN NAN HAI
Position9843340 / TANK

158,694 MT

2020

Covenas
10/27/2024 03:00
PEAK SPIRIT
Position9514171 / TANK

104,621 MT

2011

Boggy Bayou
10/15/2024 15:54
FOR ORDERS
10/24/2024 01:00
NEW JOURNEY
Position9799197 / TANK

307,341 MT

2019

Europoort
10/13/2024 21:55
Covenas
11/4/2024 13:00
THETIS
Position9648855 / BULK

57,981 MT

2013

Santa Marta
10/28/2024 11:00
Tolu
10/28/2024 23:00
MARS A
Position9224453 / TANK

159,196 MT

2002

Balboa
9/17/2024 11:25
Covenas
10/17/2024 20:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...