The shipping platform

manage your shipping data, trade and automate work-flows
Puerto Caballo Oil Terminal (Canary Islands)
ESSCT UN LOCODE
28.4500° / -16.2666° Latitude / Longitude

Port Restrictions

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

General overview: Puerto Caballo oil terminal is a port area of Santa Cruz de Tenerife.
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Fri 3
forecast-image
18 - 19°C
25.2 km/h
NEarrow
45%
Sat 4
forecast-image
17 - 20°C
24.8 km/h
NNEarrow
%
Today
forecast-image
18 - 20°C
25.2 km/h
NEarrow
0%
Mon 6
forecast-image
19 - 20°C
24.5 km/h
NEarrow
0%
Tue 7
forecast-image
19 - 20°C
23 km/h
NEarrow
0%
Wed 8
forecast-image
19 - 21°C
20.2 km/h
ENEarrow
0%
Thu 9
forecast-image
19 - 21°C
21.6 km/h
Narrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
MENCEY
Position9280146 / TANK

6,835 MT

2004

Arrecife de Lanzarote
5/5/2024 20:00
KARPATHOS
Position9382140 / TANK

6,248 MT

2010

Las Palmas
5/3/2024 06:15
ARDMORE
Position9878034 / TANK

34,777 MT

2022

Apapa
4/20/2024 09:58
DACIL
Position9427445 / TANK

7,533 MT

2011

Arrecife
5/4/2024 13:31
BIRDIE TRADER
Position9724099 / TANK

19,822 MT

2016

Agigea
4/23/2024 15:00
CAP MEJEAN
Position9459204 / TANK

3,500 MT

2009

Endesa
4/2/2024 21:40
CASTILLO DE ARTEAGA
Position9871012 / TANK

37,430 MT

2019

La Coruna
5/1/2024 11:20
La Coruna
5/5/2024 04:00
LNG IMO
Position9311581 / TANK

83,684 MT

2008

Tenerife
4/23/2024 13:56
MYKONOS
Position9371309 / TANK

4,623 MT

2008

COSTANZA M
Position9436680 / TANK

40,042 MT

2009

Huelva
4/30/2024 13:07
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...