General Description
Location: Jabung Batanghari Marine Terminal is located approximately 7nm N of LPG pipeline facilities at Simbur Naik, and 16nm E of the mouth of Batanghari River (outer bar). There are two FSO's, operated by Petrochina, moored in close proximity to each other loading crude and LPG cargoes. Max size: FSO Federal 1: LOA 160m-230m, draught 14.0m, 50,000DWT. FSO LPG Petro Star: LOA 230, draught 14.0m, 50,000DWT. Only tankers with maximum draught of 14.0m, after loading, can be accepted at the terminals.