The shipping platform

manage your shipping data, trade and automate work-flows
Payra (Bangladesh)
BGPAY UN LOCODE
21.9890° / 90.2792° Latitude / Longitude

Port Restrictions

Max draft: 15

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

The Port of Payra is a seaport located at Kalapara in Patuakhali, Bangladesh. It was established by an Act of Parliament in 2013. The Port was officially inaugurated in August 2016. It is located on the Ramnabad channel near the Bay of Bengal. To applance the project, the government has occupied a Short, Mid & Long term Plan to advance the projected state-of-the-art sea port. In place of a short term plan, by 2018 operations of the port with at least 2.5 km terminal is set to active. Moreover, by the end of 2021, procedures of the port activities and discharging cargos from mother ships at outer port and transported to the hinterlands through river routes. As a midterm plan, by 2023 the port will be completely fucntioning with a minimum 10 km container and majority terminals with all other supplementary facilities. Finally, as a long term plan, the management has decided to establish EEZ, Airport, Port City, Dockyard and Shipyard. Eco-tourism and other pertinent amenities and infrstructure addresing the port. Facilities: Payra Sea Port will have following facilities: -Jetty area has a depth of water 12-25 m where deep draught and bigger size vessel can be accomodated. -11 km long jetty/terminal facilities can be developed. -4 km wide channel. -Plenty of hinterland to develop a seaport with modern infrastructure. -Planned Navy base and Coast Guard close to proposed port area will provide necessary safety and security. -Protected from natural disaster. -Located in regional transshipment port. -Can be used as a regional transshipment port. -Constraint free large channel avaliable for anchorage and loading/unloading facilities on both sides for ships. -In compare with Chittagong Port, the Landing charge, Shipping charge and River dues are lower in Payra port. -The port will be open 24 hours. -Handling and parking facilities of motor vehicles will be avaliable. -15.00 Meter draft Vessel can be accomodated. -75000 container wll be handled in a year and this capacity is nearly 5 times more than existing sea port. -Payra sea port will generate massive employment boost, export and import and increase the capacity of the country in handling going cargos. -It will create Bangladesh-China-India-Myanmar economic corridor (DCIM)

SERVICE PROVIDERS

Port Agency

Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 30
forecast-image
27 - 38°C
35.6 km/h
SSWarrow
45%
Wed 1
forecast-image
28 - 38°C
33.1 km/h
SSWarrow
45%
Today
forecast-image
29 - 31°C
49 km/h
SWarrow
88%
Fri 3
forecast-image
29 - 31°C
34.6 km/h
Sarrow
90%
Sat 4
forecast-image
29 - 31°C
31 km/h
SSWarrow
89%
Sun 5
forecast-image
29 - 30°C
38.5 km/h
Sarrow
89%
Mon 6
forecast-image
29 - 30°C
37.8 km/h
Sarrow
89%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
EXPLORER EUROPE
Position9632985 / BULK

61,457 MT

2012

Kutubdia
4/29/2024 04:26
Payra
4/30/2024 00:00
SAPL 1
Position9220158 / CONT

2,380 MT

1998

Matarbari Port
3/26/2024 22:21
Payra
3/28/2024 17:00
DMC NEPTUNE
Position9493200 / BULK

28,183 MT

2010

Payra
4/27/2024 01:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...