The shipping platform

manage your shipping data, trade and automate work-flows
Tangguh LNG Terminal (Indonesia)
-2.4333° / 133.1333° Latitude / Longitude

Port Restrictions

Max draft: 11.5

Max beam: 46

Max LOA: 300

Max DWT: 93,600

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Tangguh is located on the S shore of Bintuni Bay, West Papua. General overview: Tangguh is an LNG export terminal handling gas from Vorwata, Wiriagar Deep, Roabiba, Ofaweri, Wos and Ubadari fields for export. Two LNG processing trains, tanker loading jetty and 2 storage tanks. The first cargo was lifted in July 09 for delivery to Gwangyang, South Korea. Load line zone: Tropical. Max size: LNG Jetty: LOA 300m, beam 46m, draught 11.5m, 93,600DWT.

AVAILABLE FACILITIES

  • Break Bulk
  • Liquid
  • LNG
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 7
forecast-image
23 - 25°C
13.3 km/h
WNWarrow
100%
Wed 8
forecast-image
23 - 27°C
9 km/h
WNWarrow
100%
Today
forecast-image
23 - 29°C
6.8 km/h
Sarrow
89%
Fri 10
forecast-image
23 - 31°C
7.2 km/h
SSWarrow
89%
Sat 11
forecast-image
23 - 31°C
8.6 km/h
Sarrow
84%
Sun 12
forecast-image
23 - 28°C
9.7 km/h
Sarrow
84%
Mon 13
forecast-image
23 - 31°C
10.4 km/h
Sarrow
89%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
TANGGUH JAYA
Position9349019 / TANK

82,313 MT

2008

Samil
4/21/2024 01:02
Tsu
5/8/2024 05:00
PETRO OCEAN XVII
Position9885740 / TANK

922 MT

2020

Tangguh LNG Terminal
4/27/2024 08:18
Sorong
4/29/2024 15:00
TRANS BILGIT
Position9790684 / TANK

1,800 MT

2015

Tangguh LNG Terminal
6/19/2023 06:21
Point
9/28/2023 19:15
SABUK NUSANTARA 61
Position9815745 / PASSCAR

750 MT

2016

Sorong
5/4/2024 11:47
Magan
5/9/2024 11:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...