General Description
Location: Sibenik lies approx midway along the Adriatic coastline between Zadar and Split.
General overview: The port of Sibenik is in a narrow basin surrounded by high land and fed by the River Krka. The commercial harbour handles bulk and general cargo, Ro-Ro and passenger traffic. Anchorage is avaliable at Prvic Island.
Imports: phosphates and potash.
Terminal for importing bulk cargo: Berths 21 & 22.
Terminal capacity: 1.000.000 t/year
Length of the quay Dobrika: 240 m
Quay depth: 9,80 m
DWT: 30.000mt
Unloading capacity: 400 t/h ship unloader Siwertell – track transport, crane length 24 m, vertical height – 17m
Cement elevator with capacity 5.000 mt per day.
Maximum draft: 9,75 m.
Maximum LOA: 200 m.
Exports: Fertilisers, bulk ores, timber and clay.
Terminal for exporting bulk cargo
Annual capacity: 400 000t
Name of Quay: Rogač
Length: 250 m
Maximum LOA: 220,00 m
Maximum draft: 10 m
Maximum beam: 25 m
DWT: 30 000mt
Loading capacity: 150 T/h 2 articulated transporters for ships up to 5000 tonnes.
2 wharf cranes with mobile baskets for cargo loading 2 x 7 tonnes (300 T/h)
Traffic figures: Approx 334 vessels, 739,000t of cargo and 538,000 passengers handled annually.
Load line zone: Summer.
Max size: LOA 220m, draught 10.0m, 50,000DWT.