The shipping platform

manage your shipping data, trade and automate work-flows
Glasgow (United Kingdom)
GBGLW UN LOCODE
55.8666° / -4.3500° Latitude / Longitude

Port Restrictions

Max draft: 9.4

Max beam: 32

Max LOA: 230

Mean Tide: 3

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: The port facilities of Glasgow are located on both banks of the River Clyde some 18nm above the Firth of Clyde (Tail of the Bank). General overview: The port is part of Clydeport and is comprised of tidal docks and riverside berths handling most types of tankers, bulk carriers, Ro-Ro and general cargo vessels. All berths are "Safe Aground". Traffic figures: Approx 12,480,000t of cargo, 40,000TEU's and 370 are handled annually. Load line zone: North Atlantic Winter Seasonal Zone II, Winter Nov 1 to Mar 31, Summer Apr 1 to Oct 31. Max size: King George V Dock: Vessels up to 9.0m FW may be accommodated subject to consultation with the Harbour Master. Shieldhall: Riverside Berth can accept vessels with max LOA 230m, beam 32m and draught 9.4m. Rothsay Dock: LOA 160m, beam 20m (up to 23m with approval), draught 6.7m (8.7m possible on HW).

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • Dry Dock
  • Ro-Ro
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Thu 16
forecast-image
10 - 16°C
17.3 km/h
ENEarrow
45%
Fri 17
forecast-image
9 - 19°C
19.1 km/h
ENEarrow
100%
Today
forecast-image
10 - 22°C
6.1 km/h
ENEarrow
86%
Sun 19
forecast-image
9 - 20°C
9.7 km/h
ENEarrow
85%
Mon 20
forecast-image
9 - 18°C
12.6 km/h
ENEarrow
86%
Tue 21
forecast-image
7 - 19°C
11.9 km/h
ENEarrow
87%
Wed 22
forecast-image
11 - 13°C
9.4 km/h
ENEarrow
62%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
CEMBAY
Position9183465 / BULK

4,216 MT

1998

Gijon
5/14/2024 15:40
Glasgow
5/17/2024 21:00
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
Cable Reels
275 MT/792 CBM
5/1/24 - 5/31/24
General Cargo,General Cargo
300 MT/---
5/9/24 - 5/23/24
Project and General Cargo
150 MT/749.04 CBM
8/12/24 - 8/19/24
Project and General Cargo
155 MT/---
8/12/24 - 8/19/24
Vapour Recovery Unit
155 MT/---
8/12/24 - 8/19/24
Connecting to SHIPNEXT Network...