The shipping platform

manage your shipping data, trade and automate work-flows
Malongo Terminal (Angola)
AOMAL UN LOCODE
-5.4333° / 12.0666° Latitude / Longitude

Port Restrictions

Max draft: 16.8

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: The terminal is situated 17km N of Cabinda. General overview: Malongo is a crude oil and LPG terminal, operated by Chevron Cabinda Gulf Oil Company (CABGOC). The oil terminal consists of SBM Berths No 1 and 2. Crude oil from the Malongo onshore tank farm is transferred to export vessels via submarine pipelines and the Malongo SPM's. Malongo LPG Terminal: LPG is stored in the storage tanker "Berge Troll" (max capacity 71,300m³, 42,920t). This is then transferred to the export vessel in a ship to ship alongside operation. Sanha LPG Terminal: LPG is stored in the storage tanker "Sanha LPG FPSO" (max capacity 135,000m³). The cargo is then transferred to the export vessel in a ship to ship alongside operation. See separate entry for Sanha LPG FPSO. Load line zone: Tropical. Max size: Oil SBM's: LOA 350m, draught 26.8m, 325,000DWT.

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • LPG
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 30
forecast-image
26 - 31°C
20.9 km/h
SWarrow
45%
Wed 1
forecast-image
26 - 30°C
20.5 km/h
SWarrow
%
Today
forecast-image
26 - 29°C
15.1 km/h
SWarrow
80%
Fri 3
forecast-image
26 - 29°C
18 km/h
SWarrow
85%
Sat 4
forecast-image
25 - 30°C
19.1 km/h
SWarrow
86%
Sun 5
forecast-image
25 - 30°C
21.2 km/h
SSWarrow
0%
Mon 6
forecast-image
25 - 31°C
21.6 km/h
SWarrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
UAL TRADER
Position9437880 / MPP

7,185 MT

2008

Escravos Oil Terminal
4/21/2024 09:17
Malongo Terminal
4/26/2024 23:00
LIMASSOL
Position9371919 / MPP

7,709 MT

2007

Pointe Noire
4/23/2024 20:38
Cabinda
4/24/2024 06:00
ONEGO BURAN
Position9578359 / MPP

7,661 MT

2010

Ango-Ango
4/29/2024 13:21
Cabinda
4/29/2024 23:00
MINERVA V
Position9315367 / TANK

318,683 MT

2007

Tanjong Pagar
3/17/2024 21:46
Cabinda
5/1/2024 21:30
AMALTHIA
Position9396294 / TANK

6,325 MT

2008

Futila Terminal
3/29/2024 10:43
Soo
4/1/2024 12:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...