The shipping platform

manage your shipping data, trade and automate work-flows
Hau Giang (Vietnam)
9.9707° / 105.8494° Latitude / Longitude

Port Restrictions

Max draft: 10.4

Max DWT: 20,000

Channel Depth: 7

Mean Tide: 3

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

2mt

Forklift

8mt

Forklift

35mt

Shore crane

45mt

Forklift

120mt

Shore crane

General Description

Location: Hau Giang Port, strategically located in the heart of the Mekong Delta, is a trade hub between Ho Chi Minh City and the Mekong Delta Key Economic Zone (consisting of Can Tho, Ca Mau, Kien Giang and An Giang), and among Mekong Delta provinces, Ho Chi Minh City and Cambodia. General overview: Hau Giang Port, administered by Vinalines Hau Giang, is an international seaport officially put into operation in August 2017. Its main facilities include Pier No.1, warehouses, yards and technical infrastructure systems. The port is capable of receiving ships of 20,000 DWT. Regarding development investment, Vinalines Hau Giang will complete the construction of the 200-metre Pier No. 2 in the 2023 - 2025 period and complete the entire construction project of the general port and maritime service complex in the 2025 - 2030 period with a total pier length of 930 metres and a combined warehousing facility area of 87.1 ha. The cargo throughput will reach 6 - 7 million tonnes, powered by modern and advanced equipment. Traffic figures: Approx. 1,000,000 tonnes of the cargo are handled annually. Load line zone: China Sea Seasonal Tropical Area, Tropical Jan 21 to Apr 30, Summer May 1 to Jan 20. Max. size: draft: 10.4 m; size: 20,000 DWT

SERVICE PROVIDERS

Port Agency

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Dry Bulk
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Thu 9
forecast-image
26 - 34°C
20.5 km/h
Earrow
100%
Fri 10
forecast-image
26 - 36°C
19.4 km/h
Earrow
100%
Today
forecast-image
27 - 35°C
17.3 km/h
Earrow
85%
Sun 12
forecast-image
26 - 35°C
10.8 km/h
SSEarrow
87%
Mon 13
forecast-image
27 - 35°C
10.4 km/h
SEarrow
88%
Tue 14
forecast-image
27 - 36°C
11.2 km/h
ENEarrow
87%
Wed 15
forecast-image
26 - 33°C
18 km/h
Earrow
79%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
SAO THUY 01
Position9348596 / MPP

2,999 MT

2005

Phu My
4/19/2024 21:50
Quang Ninh
4/24/2024 08:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...