The shipping platform

manage your shipping data, trade and automate work-flows
Lucina Terminal (Gabon)
GALUC UN LOCODE
-3.6666° / 10.7666° Latitude / Longitude

Port Restrictions

Max LOA: 150

Max DWT: 140,000

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Lucina is situated off the southern coast of Gabon, 17nm SSE of Pointe Kouango. General overview: Lucina is an offshore oil export terminal. The development consists of oil producing wells protected by 6 single four pile platforms. Production facilities are located on a four pile platform in position 03° 41.0'S 010°44.0'E. An 85,000DWT floating storage unit "Banio" (FSU) is connected to the SBM by a submarine pipeline. The SBM is situated 1km from FSU in position 03°39.6'S 011°46.2'E, there are no draught restrictions on vessels using the facility. Traffic figures: Approx 6,000,000t of cargo handled by the port annually. Load line zone: Tropical. Max size: The terminal can accommodate tankers up to 140,000SDWT and max displacement of 120,000t with a bow to manifold distance not exceeding 141m. Arrival trim must not exceed 2.4m. Largest vessel handled: "Oriental Majesty" 136,113DWT, draught 15.0m.

AVAILABLE FACILITIES

  • Liquid
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Wed 6
forecast-image
23 - 28°C
14 km/h
SWarrow
100%
Thu 7
forecast-image
24 - 27°C
15.8 km/h
SSWarrow
100%
Today
forecast-image
23 - 25°C
14.8 km/h
SSWarrow
98%
Sat 9
forecast-image
23 - 25°C
11.9 km/h
Warrow
90%
Sun 10
forecast-image
23 - 26°C
8.3 km/h
NNWarrow
89%
Mon 11
forecast-image
24 - 27°C
12.2 km/h
SSWarrow
89%
Tue 12
forecast-image
24 - 27°C
22 km/h
SSEarrow
89%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
TELI
Position9229295 / TANK

160,044 MT

2001

Etame Terminal
7/30/2023 01:32
Arica
8/12/2024 13:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...