The shipping platform

manage your shipping data, trade and automate work-flows
Charco Azul Terminal (Panama)
PACHA UN LOCODE
8.2166° / -82.8666° Latitude / Longitude

Port Restrictions

Max draft: 21.9

Max LOA: 335

Max DWT: 320,000

Mean Tide: 2

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Charco Azul, also known as Petro Terminal de Panama, lies on the Pacific coast on the W side of the Charco Azul Bay and on the E side the Burica peninsula, approx 6km S of Armuelles. General overview: The Pacific Oil Terminal consists of 2 loading and unloading docks designed to handle crude oil and other petroleum products. Other operations that can be carried out are blending, transhipment and transportation via pipeline across the Panama Isthmus to the Atlantic coast at Chiriqui Grande. Traffic figures: Approx 90 vessels and 6,300,000t of cargo handled annually. Load line zone: Tropical. Max size: LOA 335m, draught 21.9m, 320,000DWT.

AVAILABLE FACILITIES

  • Liquid
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Thu 16
forecast-image
24 - 27°C
13.3 km/h
SWarrow
100%
Fri 17
forecast-image
25 - 28°C
14.4 km/h
WSWarrow
100%
Today
forecast-image
25 - 31°C
10.1 km/h
SSWarrow
88%
Sun 19
forecast-image
25 - 29°C
15.5 km/h
WSWarrow
88%
Mon 20
forecast-image
25 - 26°C
15.8 km/h
WSWarrow
81%
Tue 21
forecast-image
25 - 27°C
14 km/h
SWarrow
83%
Wed 22
forecast-image
23 - 28°C
12.2 km/h
SWarrow
89%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
NEW WISDOM
Position9486506 / TANK

317,960 MT

2011

Taboguilla Island
5/8/2024 08:30
Puerto Armuelles
5/9/2024 10:00
SYDNEY SPIRIT
Position9594781 / TANK

158,542 MT

2012

Melones Oil Terminal
5/13/2024 21:46
Puerto Armuelles
5/14/2024 15:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...