Csl Flexvik

M/V Csl Flexvik

Last update: 6/10/2024


    No tags found


Open Positions
lock

Information

Csl Flexvik 9521825 is a Multipurpose and HeavyLift Carrier, built in 2012 (12 years old). It's sailing under the flag of Malta.

According to the latest AIS and Satellite data, the vessel is currently on route to Szczecin, Poland. Estimated time of arrival at Szczecin, Poland is 4/24/2024 at 6:00:0.

Vessel's current position is 053° 26' 36" N / 014° 34' 57" E. The vessel is proceeding from Dakar, Senegal to Szczecin, Poland.

For more information please go to Csl Flexvik.

Vessel Particulars

DISPONENT OWNER
************************
NAME
Csl Flexvik
DEADWEIGHT
17,070 mt
IMO
9521825
FLAG
Malta
YEAR
2012
SHIP OWNER
---
SHIP MANAGER
---
BUILDER COUNTRY
---
BUILDER YARD
---
PORT OF REGISTRY
---
CLASS
---
ICE CLASS
1C
P&I CLUB
---
TYPE BY PURPOSE
Multipurpose and HeavyLift Carrier
BY CONSTRUCTION
---
BY SPECIALTY
---
DESIGN
Bestway 16.9K Laker
OTHER
• Open Hatch not fitted
• Box Shaped not fitted
TONNAGE
• GT/NT: 13,579 / ---
• Suez GT/NT: --- / ---
• Panama GT/NT: --- / ---
DEADWEIGHT/OTHER
 Load dis.DWT, mtDraft, m
S:---17,070 8.25
T:---------
W:---------
F:------ ---
TPC/TPI
 TPCTPI
S:31.1 ---
T:------
W:------
F:------
CAPACITY
• Grain: 22,195 m3
• Bale: ---
• TEU: ---
• FEU: ---
• Constant: ---
Grain / Bale / TEU / FEU
Hold:
Tweendeck:
DIMENSIONS
• LOA: 149.96 m
• Beam: 23 m
• LBP: ---
• Depth: 12.5 m
HOLDS / HATCHES
• HO/ HA: 5 /5
• Hatch type: ---
• Area main deck: ---
• Area tween deck: ---
• Area weather deck: ---
• Total: ---
HOLDS
LBHArea
------------
TWEENDECKS
LBHArea
------------
HATCHES
LBArea
---------
BUNKERS
---
PERMISSIBLE LOADS
• Max TT strength: ---
• Max Tween strength: ---
• Max Weather Deck strength: ---
• 20' Max stackweight hold: ---
• 20' Max stackweight deck: ---
• 40' Max stackweight hold: ---
• 40' Max stackweight deck: ---
GEAR & GRABS
Gear/Outreach/SWL:
Geared
CR - 3 - 30 - --- - 30
Grabs
TECH. EQUIPMENT
---
ENGINE LOCATION
---
LANE METER
---
DESCRIPTION
---
Exclusions
lock
Preferences
lock

SPEED & CONSUMPTION
lock

ATTACHMENTS
lock

PREVIOUS PORTS

---

PAST NAMES

Ex Name
Edited by
Date
Raba
Shipnext.com
3/21/2022
Ale
Shipnext developers
12/11/2023

COMMENTS
lock





edit


edit

STATUS

COMPLIANCE CHECK
lock

PORT STATE CONTROL STATEMENT
lock

 DatePortPlaceCountry
Last Dry Dock
---
---
---
---
Last Survey
---
---
---
---
Connecting to SHIPNEXT Network...